Basic characteristics

 

Central control system

The tried and tested multiple-standard design of ABUS control systems covers a wide range of applications. These are available in two different versions:

  • The decentralised control system is sub-divided into separate panels on the crane bridge (SKR) and on the trolley (SKA).
  • The centralised control system for the crane and the trolley is installed in a central position on the crane bridge.
Description

Load measuring system LIS

The especially developed control unit LIS is used on all ABUS wire rope hoists for control purposes. Two versions of this unit are available; the LIS-SE or the LIS-SV unit. Both units feature an overload protection which protects the hoist against overload and an operating hours meter as a standard.